| Allan Duffin
Over the years we've been called out to all sorts of high-rise and hard-to-reach jobs. Here's a look at the kind of problems that typically bring a facilities manager or building owner to a rope access team instead of scaffold or a cherry picker.
A Recent Example:
A high-rise residential block had several cladding panels damaged in a storm, with render coming away from the building above street level. Full scaffold would have taken weeks to plan and erect - not viable with exposed cladding letting water into the building fabric. Our team mobilised within days, replaced the damaged panels safely, and had the building weathertight again with minimal disruption to residents below.
If you're managing a building and something similar sounds familiar - get in touch, we're happy to have a look.
Gallery