Pipework and structural openings inside the Tyne Bridge North Tower

The Challenge

Tyne Rope Access needed to carry out cleaning and bird-proofing works within the North Tower of the Tyne Bridge. Existing pipework and the internal structure created awkward areas that needed to be reached to complete the work.

Rope access technician working beside pipework inside the North Tower

The Solution

Using rope access, the team reached the required working positions and carried out jet washing within the tower. Bird-control netting was then installed around the relevant pipework and openings to create a physical barrier restricting bird access.

Bird-control netting fitted around internal pipework and openings

The Result

The required areas were cleaned and bird-control netting was installed around the relevant parts of the internal structure, completing both elements of the maintenance work.


Get In Touch

Give us a call on 0191 447 1788 or send an email to hello@tyneropeaccess.com to tell us about your job.

Want to see more real jobs like this one?

We add new case studies as we complete them - join the list to see them first.

Thanks for signing up! Keep an eye on your inbox.

By subscribing, you agree to receive emails from us - see our Privacy Policy. Unsubscribe anytime.

Follow our founder Allan on LinkedIn - hundreds of real job photos and 11,100+ followers